The FiltaBoomTM can be installed in 4 easy steps, outlined below.

 

 

 

1. Position the initial boom with the loose seam facing the path of the potential flow.

 

 

 

 

2. Hammer a tent peg through the seam at the lowest point, or where there is expected to be the most flow. Continue pegging at every 500mm, ensuring the pegs have been hammered below ground level.

 

 

 

 

3. Position the next FiltaBoomTM with the butt end placed over the end seam. Push down hard and avoid any potential gaps.

 

 


 

 

4. Peg through the top FiltaBoomTM end seam down through the bottom seam. Once again, ensure pegs are hammered down below ground level.